JD Landscapes & Fencing 07585 774425

Airdrie · North Lanarkshire

The part you don't see is the part that lasts.

Porcelain paving, patios, driveways and fencing. The slabs are what you notice — the sub-base, the fall and the edging are what decide whether it's still flat after five winters.

Porcelain paving laid in a grid beside a gravel edge
Illustrative image — not a photograph of this business
10+Years building
895Following the work
2026Projects in Airdrie

What's under the surface

Drag the handle. Left is the finished paving; right is what it sits on. This is the bit that decides whether a patio is still level in 2031.

Finished porcelain paving Patio under construction: sub-base and mortar bed
FinishedUnderneath

The work

Four things, done in the right order: dig, base, edges, then the surface.

Porcelain paving
PavingPorcelain patios

Slabs on a full bed with a fall away from the house. Not dotted and dabbed.

Finished garden with paving and planting
DrivewaysBlock and slab drives

Sub-base built for a car, with edging that holds the pattern.

Groundwork in progress
FencingBoundary fencing

Posts set at depth in concrete, rails fixed to last, a gate that still closes.

How a job runs

One crew, one sequence — no waiting on another trade to come back.

01 — Look at it

Levels, drainage, access, and what the garden is actually for.

02 — Price the whole thing

Including the groundwork. Not a headline number that grows once the turf is off.

03 — Build it

Dig, base, edges, surface, fence. Site cleared each day.

Asked before booking

Straight answers — ring if yours isn't here.

Do you do the groundwork too?

Yes. That's the point — if the base is done by someone else and it fails, nobody owns it.

How long does a patio take?

Usually three to five working days, depending on size, access, and how much has to be dug out.

Do you cover Coatbridge and Cumbernauld?

Airdrie is the base; the surrounding towns are normal. Ask about anything further out.

Do you take small jobs?

Yes — a single fence run or a small path is a normal job.

What about drainage?

Falls are set away from the building and checked before the slabs go down. Standing water at a back door is a design fault, not bad luck.

Send a photo of the garden

A picture and roughly what you want is enough to start.

Area
Airdrie and North Lanarkshire